Visitors and contractors may be unfamiliar with your building and its emergency procedures. A short, relevant briefing helps them understand the arrangements while giving your team a clearer picture of who is on site and what work is taking place.
Tailor the arrival information
Explain the alarm response and how to contact the site representative. For contractors, discuss the work area, access restrictions and any activities that may affect fire safety. Avoid handing over a long document without identifying the points relevant to that particular visit.
Agree how people are accounted for
Use an arrival and departure process that fits the premises. Discuss how visitor information reaches the people supporting evacuation arrangements. For shared buildings, check that your local process connects sensibly with the arrangements managed by the landlord or agent.
Review the work, not just the paperwork
Ask contractors to report changes to the agreed activity or location. Keep communication open if routes, systems or normal working areas are affected. A signed arrival form is only a starting point; the practical arrangements need to remain suitable throughout the visit.
Make the arrival briefing useful to the visit
A visitor attending a short meeting needs understandable instructions about the local alarm response and whom to follow or contact. A contractor working in a service area may also need information about restrictions and the effect of their work on normal arrangements. Use a briefing suited to the activity instead of asking both people to read the same long document unaided.
Confirm how the instructions will be provided if the usual host is absent. Reception staff, temporary hosts and contractors arriving outside normal hours should have a clear contact. Where somebody needs information in an alternative format, discuss a suitable way to provide it rather than assuming the standard written notice will be enough.
Keep information current during the visit
An attendance record needs an agreed departure process. If visitors sign in but leave without updating the record, the information may not reflect who remains on site. Explain the process simply and connect it with the emergency arrangements for the premises. Decide how the necessary information reaches those supporting the response.
For contractors, ask for changes to the work location or activity to be raised with the site representative. A task moving into another area may affect people who were not included in the original briefing. Record any agreed change and explain it to the relevant teams. At the end of the work, check that temporary equipment, materials or barriers have been dealt with as agreed, and record anything that still needs the premises manager’s attention.
Instructions need to remain accurate when the building changes. If contractors are carrying out alterations, read fire safety during refurbishment alongside the arrival briefing. Our escape-route guide addresses temporary storage during daily activity. These are connected operational questions: where work happens, where materials wait and how people receive current instructions. Review the agreed arrangements if the visit lasts longer or covers a different area than originally expected.
Put it into practice
- Provide a briefing relevant to the visit.
- Keep arrival and departure information usable.
- Discuss changes to work or access arrangements.
For further context, read the Scottish Government guidance on people in the premises alongside the arrangements for your own premises.
Discuss your premises with OnGuard
For practical fire risk assessment support, speak with OnGuard. Tell us about your building, your team and the issue you want to address so we can discuss the next step.



